What engineers and project managers say about our prestressed concrete floors for heavy machinery.
The 300mm slab held the 50-ton gantry crane alignment within 2mm after six months of operation. No cracking at the anchor points.
Farah Mitra, project manager — Gantry Crane Floor ReinforcementVibration readings stayed below 0.5 mm/s on the tuned mass damping slab. The rotating equipment runs without transferring movement to the adjacent bay.
Bharat Persad, structural engineer — Rotating Machinery Foundation SlabThe silica fume mix cured without cold joints in a single continuous pour. After two years of chemical exposure, the surface shows no degradation.
Farah Mitra, site supervisor — Chemical Pour for Industrial FloorReach out directly for project inquiries, technical discussions, or site coordination.
Email info@ledererinvestments.com Phone 058 51953760 WhatsApp +058 51953760 Telegram @ledererinvestments